FAQs
Bathroom remodel timeline varies based on the project’s complexity and whether any layout changes are involved. The amount of tile work, especially if you’re adding a large tiled shower, can also impact the schedule. On average, smaller remodels take about 4 weeks, while more extensive projects with significant layout changes and lots of tile installation can extend up to 10 weeks.
Whether you need a building permit for your project depends on how in depth the work will be. If you are doing a pull-put style remodel where you are replacing finishes in their same location, a building permit is not required. When your renovation includes moving or altering Load bearing framing, Plumbing, Electrical, or HVAC fixture locations, your project will require a building permit. Remember, if you are hiring a licensed general contractor, it is their responsibility to pull the building permit, NOT YOU!
Popular Blue Ridge bathrooms include:
• Primary bathrooms
• Powder rooms
• Basement bathrooms
• Aging in place
• Floor plan reconfiguration
• Pull and replace
In most cases, it’s not necessary to move out during a bathroom remodel. Many homeowners have multiple bathrooms, allowing them to manage comfortably while the one under renovation is temporarily out of service. We strive to minimize disruption, ensuring the process is as seamless as possible so you can remain in your home throughout the project.